Project – Concrete Repairs at St John Primary School
Product – NATCEM® 35
Contractor – Richardson & Starling
NATCEM® 35 was specified for a series of concrete repairs at St John Primary School in Barrhead, addressing deteriorated as well as damaged structural elements identified during a recent survey.
The building, which was constructed primarily from reinforced concrete, had exhibited significant spalling and corrosion, particularly on exposed reinforcement areas across various elevations. Moreover, previous render repairs had de-bonded from the concrete substrate, further accelerating deterioration.
As a result, Cowal Design, which was tasked with designing the remedial works, highlighted the need for a high-performance repair mortar with minimal shrinkage, rapid setting properties, and exceptional durability. Consequently, NATCEM® 35 was selected due to its proven ability to meet these stringent requirements without the need for additional primers.
The works were conducted in two phases:
Phase 1 – Repairs to the rear elevation, addressing spalling on copes, beams, and lintels.
Phase 2 – Repairs to the left, right, and front elevations, including inaccessible areas, for which allowances were made.
Key tasks included:
Why NATCEM® 35?
Firstly, NATCEM® 35 was chosen for its compatibility with existing substrates and its durability in challenging repairs. Additionally, its rapid-setting formula and corrosion resistance eliminated the need for primers, thus streamlining the process.
Outcome
As a result, the project was completed efficiently, with Richardson & Starling’s operatives ensuring all repairs met specifications. Consequently, NATCEM® 35 provided robust protection against further structural damage, safeguarding the school’s concrete elements for years.